Concrete Slab Calculator (2026) – Yards, Cost & Rebar
Calculate concrete for any slab, pad, patio, driveway, or garage floor. Get cubic yards, bag counts, 2026 cost by US region, and rebar quantity.
Slab Results
Live calculation active
*Material cost only. Labor adds $2–$5/sqft. Always get 3 contractor quotes.
Common Concrete Slab Sizes — Quick Reference
| Project | Common Size | Thickness | Cubic Yards | Est. 80 lb Bags |
|---|---|---|---|---|
| Small patio | 10×10 ft | 4 in | 1.23 yd³ | 56 bags |
| Standard patio | 12×16 ft | 4 in | 2.37 yd³ | 107 bags |
| Large patio | 20×20 ft | 4 in | 4.94 yd³ | use ready-mix |
| 1-car garage | 12×20 ft | 4 in | 2.96 yd³ | use ready-mix |
| 2-car garage | 20×20 ft | 4 in | 4.94 yd³ | use ready-mix |
| Residential driveway | 10×20 ft | 6 in | 3.70 yd³ | use ready-mix |
| Sidewalk (50 ft) | 50×4 ft | 4 in | 2.47 yd³ | use ready-mix |
All figures include 10% waste factor.
Concrete Slab Cost by US Region (2026)
Total installed slab cost = concrete material + labor + finishing. Labor and finishing typically add $2–$5 per square foot on top of material cost.
| Region | Material ($/yd³) | Total Installed ($/sqft) | 10×10 Slab Total |
|---|---|---|---|
| Northeast | $175–$225 | $7–$12 | $700–$1,200 |
| West Coast | $165–$215 | $6–$11 | $600–$1,100 |
| Mountain West | $150–$190 | $5–$9 | $500–$900 |
| Midwest | $140–$175 | $4–$8 | $400–$800 |
| South | $130–$165 | $4–$7 | $400–$700 |
Slab Thickness by Application
- Sidewalks & walkways: 4 inches — ACI minimum for exterior flatwork
- Patios & pool decks: 4 inches — increase to 5 in if heavy furniture
- Garage floors: 4–6 inches — 6 in recommended for trucks/heavy vehicles
- Residential driveways: 4–6 inches — 6 in standard in cold climates
- Commercial driveways: 6–8 inches — for delivery vehicles and forklifts
Rebar & Wire Mesh Guide for Slabs
Rebar and wire mesh add tensile strength — concrete is strong in compression but weak in tension. For residential slabs, the choice is between rebar grids and fiber mesh additives:
| Method | Application | Spacing | Notes |
|---|---|---|---|
| #3 Rebar grid | Patios, sidewalks, garage floors | 12–18 in on center | Place at mid-depth (2 in up from bottom) |
| #4 Rebar grid | Driveways, commercial slabs | 12–24 in on center | Required where vehicle loads are expected |
| 6×6 Wire mesh | Patios, light-duty slabs | 6-in grid | Less effective than rebar but easier to install |
| Fiber mesh | All slabs | Mixed into concrete | Reduces plastic shrinkage cracks; doesn't replace structural rebar |
Concrete Slab FAQ
How to Prepare a Site for a Concrete Slab
The quality of a concrete slab depends as much on what happens before the pour as during it. Poor sub-base preparation is the leading cause of cracked and settled slabs — no amount of good concrete can compensate for a weak base.
Step 1 — Excavate and Grade
Remove all topsoil, organic material, and vegetation from the slab area. Topsoil compresses and decomposes over time, causing settlement. Excavate to the required depth (typically 6–8 inches below finished slab grade to allow for sub-base plus slab thickness). Grade the area to drain water away from structures — minimum 1% slope (⅛ inch per foot) away from buildings.
Step 2 — Compact the Sub-Base
Place 4–6 inches of compacted crushed gravel (¾-inch clean gravel or road base) over the excavated area. Compact in 2-inch lifts using a plate compactor — never compact the full 4 inches in one pass. Proper compaction prevents differential settlement that cracks slabs. In cold climates, a well-drained gravel base also helps prevent frost heave by preventing water from accumulating under the slab.
Step 3 — Install Forms
Set 2×4 or 2×6 lumber forms along the perimeter of the slab. Use a level and stakes to ensure forms are perfectly flat — any variation will show in the finished surface. Brace forms every 2–3 feet to prevent blowout when concrete is placed. Oil the inside of forms lightly to allow removal without damage.
Step 4 — Place Vapor Barrier (if on grade)
For interior slabs (garage floors, basement floors, shop floors), place 6-mil polyethylene sheeting over the gravel base before pouring. This prevents ground moisture from wicking up through the slab, which causes efflorescence, paint failure, and moisture problems in finished spaces.
Step 5 — Set Rebar or Wire Mesh
Place rebar on chairs or dobies at the correct height — typically 1.5–2 inches from the bottom of the slab for a 4-inch slab. Rebar that rests on the ground provides no tensile benefit. Overlap rebar splices by at least 18 bar diameters (18 × 0.375 in = 6.75 inches for #3 rebar).
Step 6 — Order and Pour Concrete
Confirm your cubic yardage (use this calculator) with the ready-mix plant and schedule delivery. Have all tools staged: screed board, bull float, hand float, edger, jointing tool, and knee boards. Pour concrete starting from the far corner and work back toward the truck. Strike off with a screed, float, then finish as the bleed water disappears. Cut control joints at 1/4 the slab thickness every 8–12 feet to control where cracking occurs.
Slab Prep Cost Summary
| Prep Item | Typical Cost | DIY vs. Hire |
|---|---|---|
| Excavation (10×10 ft) | $150–$400 | DIY possible with shovel; hire for large areas |
| Gravel sub-base (4 in) | $80–$200 | DIY — order from a landscape supply yard |
| 2×6 form lumber | $40–$120 | DIY |
| Vapor barrier (6 mil) | $25–$60 | DIY |
| Rebar (#3, 12-inch grid) | $80–$200 | DIY with rebar cutter/bender or bolt cutters |
| Concrete finishing tools | $50–$150 (rental) | Rent bull float, edger, jointer |
Common Concrete Slab Mistakes to Avoid
- Adding water to loosen the mix. This is the single most damaging mistake. Adding ½ gallon of water per yd³ reduces concrete strength by 200 PSI. Never add water after the truck leaves the plant.
- Finishing too early. Working the surface while bleed water is still present traps water beneath the surface layer, causing scaling and delamination. Wait until bleed water disappears before floating.
- Skipping control joints. Concrete always cracks — the question is where. Control joints (saw cuts or hand-tooled grooves) at ¼ slab depth every 8–12 feet direct cracks to a straight, inconspicuous line.
- Pouring in direct sun or high wind. Both cause rapid surface drying before the bulk of the concrete sets, leading to plastic shrinkage cracks. Erect windbreaks and sun shades for large exterior pours in summer.
- Not testing soil compaction. Soft spots under the slab will settle. Walk the area after compacting — if it feels soft or spongy anywhere, add more gravel and re-compact.
- Ordering exactly the calculated amount. Always add 5–10% to your calculation. Running short during a pour is a serious problem — a cold joint (where fresh meets partially set concrete) is a permanent structural weakness.